52 Incorporate a List of Projects Funded by Senate Bll 1 The Road Repair and Accountability Act to Budget TOWN OF TRUCKEE California RESOLUTION 2017-52 A RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF TRUCKEE AMENDING THE 2017-18 BUDGET TO INCORPORATE A LIST OF PROJECTS FUNDED BY SB 1: THE ROAD REPAIR AND ACCOUNTABILITY ACT WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into law by the Governor in April 2017 to address the significant multi-modal transportation funding shortfalls statewide; and WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the residents of the Town of Truckee are aware of the projects proposed for funding in the community and which projects have been completed each fiscal year; and WHEREAS, the Town of Truckee will receive and estimated $91,419 in RMRA funding in Fiscal Year 2017-18 from SB 1 and $274,239 in Fiscal Year 2018-2019; and WHEREAS, the Town of Truckee must include a list of all projects proposed to receive funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, in the Town of Truckee budget, which must include a description and the location of each proposed project, a proposed schedule for the project's completion, and the estimated useful life of the improvement; and WHEREAS, the Town of Truckee's Pavement Maintenance Program has identified an annual slurry seal program to be an effective means to extend the life of pavement and reduce the frequency of pavement overlays or rehabilitation and identifies a schedule over which slurry seal is applied to local roads at 3-5 year intervals; and WHEREAS, the Pavement Maintenance Program was reviewed with the Tahoe Donner Association and Glenshire/Devonshire Residents Association staff and was approved by the Truckee Town Council on June 7, 2012 in a public Town Council meeting; and WHEREAS, the Town of Truckee has undergone a process to ensure public input into our community's transportation priorities/the project list; and WHEREAS, the funding from SB 1 will help the Town of Truckee maintain our roads by providing funding to slurry seal approximately 78 roads representing 33 miles in fiscal years 17/18 and 18/19 and to maintain similar maintenance levels on all Town roads into the future; and WHEREAS, the 2012 Pavement Maintenance Program found that the Town of Truckee streets and roads are in good condition and this revenue will help us to maintain the overall quality of our road system and at a good condition by allowing the continued implementation of our Pavement Maintenance Program; and WHEREAS, the Town of Truckee is responsible for maintenance of 157 miles of local roads in the Town limits, on which the community depends for all modes of transportation and emergency access; and WHEREAS, maintaining and preserving the local street and road system in good condition will reduce drive times and traffic congestion, improve bicycle safety, and make the pedestrian experience safer and more appealing, which leads to reduce vehicle emissions helping the State achieve its air quality and greenhouse gas emissions reductions goals; and WHEREAS, restoring roads before they fail also reduces construction time which results in less air pollution from heavy equipment and less water pollution from site run-off; ...... NOW, THEREFORE, BE IT RESOLVED, DETERMINED, AND ORDERED, BY THE TOWN COUNCIL OF THE TOWN OF TRUCKEE AS FOLLOWS: 1. The Town of Truckee Capital Improvement Program budget is amended incorporate the 2018 Slurry Seal Project as described in Exhibit A. 2. The 2018 Slurry Seal Project (C1801) budget for Fiscal Year 17/18 and 18/1.9 is amended to include funding from the Road Maintenance and Rehabilitation Account as shown in Exhibit B to incorporate the list of projects identified in Exhibit A. 3. Appoint the Town Manager, or designee, to execute all applications, negotiations and agreements which may be necessary for completion of the aforementioned project and expenditure of RMRA funds, except those designated to the Town Engineer below. 4. Appoint the Town Engineer, or designee, to execute and submit all reports, payment requests, and changes to the project description, which may be necessary for completion of the aforementioned project and expenditure of RMRA funds. The foregoing Resolution was introduced by Vice Mayor Wallace Dee, seconded by Council Member Abrams, at a Regular Meeting of the Truckee Town Council, held on the 10th day October 2017, and adopted by the following vote: AYES: Council Members, Tirman, Abrams, Flora, Vice Mayor Wallace Dee, and Mayor Goodwin. NOES: none. ABSENT: none. / iJ -tom Morgan Goodwin, Mayor ATTEST: Judy P ice, M C, Town Clerk Exhibit A: 2018 Slurry Seal (C1801) Project Planned to be Funded with Road Maintenance and Rehabilitation Account 1 • TOWN OF TRUCKEE ROAD REPAIR AND ACCOUNTABILITY ACT LOCAL STREETS AND ROADS FUNDING 2017 PROPOSED PROJECT BUDGET FOR ROAD MAINTENANCE AND REHABILITATION ACCOUNT (RMRA) October 10, 2017 PROPOSED PROJECT: 2018 SLURRY SEAL PROJECT Project Description The 2018 Slurry Seal Project would apply slurry seal to approximately 33 miles of local road, representing 78 roadway segments. A slurry seal is a cold-mix combination of asphalt emulsion, fine well-graded aggregate, and water.This is a versatile treatment which results in a smooth surface with adequate friction with moderate costs. Slurry seals have been used by the Town for several years and have proven to be a cost-effective preventive treatment that is well accepted by the community. Project Location The preliminary list of roads that are anticipated to be slurry sealed in 2018 are presented in the attached table and are also depicted in the attached figure. Proposed Schedule for Completion The 2018 Slurry Seal project is anticipated to start in spring or early summer of 2018.Work will continue through the summer with a completion anticipated by October 15, 2018. Estimated Useful Life Applying a pavement treatment, such as a slurry seal,to a road can prolong the roads life.Through past experience, the Public Works Department has determined the most cost-effective strategy for pavement maintenance is to apply slurry seal on non-arterial roads every 3-5 years (dependent on location). This maintenance is having positive results, with the greatest benefit being on local roads. The 2012 Pavement Maintenance Program estimated that a Type II slurry seal typically adds 3.5 rating points to the Overall Condition Index (OCI) of a local road. The Pavement Maintenance Program shows that over time this can extend the life of a roadway by 5-15 years and reduces the frequency at which more expensive and less sustainable treatment options, such as repaving or reconstruction, are required. 2 2018 Slurry Seal Project-Preliminary List of Roads to be Slurry Seal Segment ID Street Description 121 Balfour Reach Sherwood to end 141 Basel PI Lausanne to Mougle 151 Bavarian Way Mougle(E)to Mougle (W) 181 Beckett PI Regency Cir.to S end 191 Belford PI Edinburgh to S end 202 Bennett Flat Rd Laussane N to Laussane S 201 Bennett Flat Rd Hansel.to Laussane 271 Bluejay Ln Lariat to Whitetail 332 Brookstone Dr Schussing to end 331 Brookstone Dr Lausanne to Schussing 351 Canterbury Ln Courtenay to Glenshire 411 Chamonix Rd Falcon Point to Northwoods 451 Chelsea PI Glenshire to end 461 Chickwich Reach Sherwood to South end 581 Courtenay Ln Sommerset to N end 601 Crocus Ct Crocus Dr.to end 611 Crocus Dr Laurelwood to Heather 651 Daisy Ct Iris Rd.to end 742 Donnington Ln Somerset to Strand 771 E Alder Creek Rd Hwy 89 to Rainbow 772 E Alder Creek Rd Hwy 89 to Rainbow 831 Edinburgh Dr Regency Cir to end 892 Falcon Point PI Chamonix to Hansel 891 Falcon Point PI Muhlebach to Chamonix 941 Forest Ct Pine Forest to end 1031 Greenleaf Way Hansel to Pathway 1041 Greenwood Ct Greenwood Dr.to end 1051 Greenwood Dr PineFor. N to PineFor.S 1072 Hansel Ave Lausanne to Northw W 1071 Hansel Ave Northw E to Lausanne 1081 Hastings Hts Regency Cir to end 1091 Heather Rd PineForest to EAlderCr 1211 Iris Rd Poppy to Pine Forest 1242 Jeffrey Way Poppy to Greenwood 1261 Julian Ave Oslo to Northwoods 1271 K T Ct Mougle to end 3431 Kent Dr Sherwood to end 1321 Kitzbuhel Rd Mougle to Sitzmark 1351 Lakeview Ct Rainbow to end 1361 Lancaster PI Regency Cir.to end 3 2018 Slurry Seal Project-Preliminary List of Roads to be Slurry Seal Segment ID Street Description • 1371 Lance Dr Wiltshire Ln.to end 1381 Landeau Ln Muhlebach to Hansel 1401 Lariat Ct Lariat Dr.to end 1411 Lariat Ln Rainbow to Whitetail 1431 Laurelwood Dr Rainbow Dr.to end 1441 Lausanne Way Northwoods to Hansel 1442 Lausanne Way Hansel S to Hansel N 1461 Lemon Ct Heather Rd.to end 1471 Lenelle Ln Pine Forest to Greenwood 1501 Lilac Ct Iris Rd.to end 1531 Madrone Ln Rainbow to Greenwood 1653 Mougle Ln 11406 Mougle to Mougle/Mougle 1651 Mougle Ln Sitzmark to 11820 Mougle 1652 Mougle Ln 11820 Mougle to 11406 Mougle 1671 Muhlebach Way Northwoods to Landeau 1672 Muhlebach Way Landeau to Muhlebach 1681 Munich Dr Sitzmark to Mougle 1701 Nordic Ln Sitzmark to Mougle 1761 Old Highway 40 Glenshire to end. 1821 Oslo Dr Hansel to Oslo 1831 Oxford Cir Courtenay to Wellington 1881 Pathway Ave Hansel to Schussing 1941 Pine Forest Rd Rainbow to EAlderCreek 1991 Poppy Ln EAlderCrk to Heather 2011 Prosser Dam Rd Hwy 89 to 35mph zone 2012 Prosser Dam Rd 35mph zone to end 2051 Rainbow Dr Hwy 89 to E Alder Creek 2111 Regency Cir Courtenay to end 2232 Roundhill Dr 500ft Eto Muhlebach E 2231 Roundhill Dr Muhlebach to 500ft E 2571 Saint Bernard Dr Hansel S to Hansel N 2572 Saint Bernard Dr Hansel to Schussing 2573 Saint Bernard Dr Schussing to end 2591 Saint James PI Winsor Wy.to end 2304 Schussing Way Tahoe Donner Monument to Alder Creek Rd 2303 Schussing Way Pathway to Tahoe Donner Monument 2301 Schussing Way Lausane to St. Bernard Dr. 2302 Schussing Way St. Bernard Dr.to Pathway 2311 Sheffield PI Somerset to end 4 2018 Slurry Seal Project-Preliminary List of Roads to be Slurry Seal Segment ID Street Description 2321 Sherwood Dr Sommerset to end 2381 Sitzmark Way Mougle to Schussing 2391 Ski Run Rd Rainbow to Whitetail 2451 Snow Shoe Cir Rainbow N to Rainbow S 2461 Snow Shoe Ct Snowshoe Cir.to end 2511 Somerset Dr Glenshire to end 2751 Surrey PI Donnington to end 2811 Telemark PI Schussing to end 2901 Tundra Dr Mougle to end 3001 Wellington Way Courtenay to Glenshire 3002 Wellington Way Glenshire to end 3011 WhiskeyJack Ct Rainbow Dr.to end 3051 Whitetail Ct Rainbow Dr.to end 3061 Whitetail Ln Rainbow to Pine Forest 3091 Wiltshire Ln Canterbury to Glenshire 3101 Windsor Way Sommerset to end 3111 Winter Ave Hansel to Oslo 1 5 Town of Truckee - 2018 Slurry SealTownwide • r._.a- Ae . f r$41 PIN1 4 ck".,' 4 tp, !_f_ .. Viiiit*A f i. _ VVV lib izt. .. Mr; )10 # . .N r-'. ,4 I c"11 . t illi • .N• "Vic. I i rope i V ,N, f ..,..4 .parr , �1 �+ �- l '' "' _,.....vI " �� _a ' . -7 1, t ,...... --Ni.. ,,if ..-. '...c...A.i. . - - ....,";,. ., :470 -41.,,,,,,w. op,.. �"` ` - � �'��ill 1 ice.. . 11 1 ��-� �1 t._ _ Legend Irr." `^ i r I tilurr. Exhibit B: 2018 Slurry Seal Project (C1801) Amended Budget 17/18 18/19 Funding Source Fiscal Fiscal Total of Both Year Year Fiscal Years RMRA Funds $91,419 $274,239 $365,658 Measure V Funds $0 $311,342 $311,342 TSSA #1 - Tahoe Donner $25,000 $162,000 $187,000 TSSA#5 — Glenshire $6,000 $37,000 $43,000 Total $122,419 $784,581 $907,000