Laserfiche WebLink
1 <br /> GRAY'S CROSSING SPECIFIC PLAN PROJECT <br /> DRAFT <br /> ' ENVIRONMENTAL IMPACT REPORT <br /> 1 <br /> TRAFFIC MODELING OUTPUT PROVIDED BY LSC <br /> TRANSPORTATION CONSULTANTS, INC. <br /> ' (Appendix 8 to the Draft EIR) <br /> Prepared for: <br /> TOWN OF TRUCKEE <br /> 10183 Truckee Airport Road <br /> Truckee, CA 96161 <br /> Prepared by: <br /> PACIFIC MUNICIPAL CONSULTANTS <br /> 140 Independence Circle, Suite C <br /> Chico, CA 95973 <br /> 530 - 894 -3469 <br /> Fax: 530- 894 -6459 <br /> www.pacificmunicipal.com <br /> June 2003 <br /> t <br />