<br />SR 89 MOUSEHOLE STAKEHOLDERS COMMITTEE MEETING <br />DRAFT OCTOBER 15, 2007 MEETING MINUTES <br />4:30 p.m. <br /> <br />Truckee Town Hall <br />Administrative Conference Room <br /> <br /> <br />Present: <br />Winder Bajwa, Caltrans <br />Becky Bucar, Town of Truckee Assistant Engineer <br />Jan Colyer, Truckee North Tahoe Transportation Management Association <br />Carolyn Wallace Dee, Truckee Town Council <br />Denny Dickinson, Truckee Stakeholder <br />Patrick Flora, Truckee Planning Commission <br />Dan Landon, Nevada County Transportation Commission <br />Michelle Nieves, Donner Creek Mobile Home Park <br />Brian Stewart, Placer County Department of Public Works <br />Josh Susman, Truckee Town Council <br />Steve Teshara, North Lake Tahoe Resort Association <br />Ron Treabess, North Lake Tahoe Resort Association <br />Dan Wilkins, Public Works Director/Town Engineer <br />David Yardas, Truckee Trails Foundation <br /> <br />Meeting Started at 4:40 p.m. <br /> <br />1. The group started with introductions. <br /> <br />2. The group discussed a time and day of the week for future meetings. Josh Susman indicated that <br />weekdays after 4:30 PM work best for him and Carolyn Dee. As Mondays do not work for the <br />TRWC, Planning Commission meetings are held on Wednesdays, and Town Council meetings <br />are held on Thursdays, it was decided that Tuesdays work best. <br /> <br />3. Dan Wilkins discussed the project background. <br />? <br /> The Federal Government earmarked $2.82 million of Federal Surface Transportation Funds <br />towards the replacement of the SR 89 Mousehole. <br />? <br /> Nevada County Transportation Commission has earmarked an additional $500,000 towards <br />this project. <br />? <br /> Caltrans has held 2 public open houses. <br />? <br /> Caltrans has prepared several technical studies and surveys. <br />? <br /> Caltrans has taken on lead agency status. <br /> <br />4. Dan Wilkins discussed how the project alternatives propose to create new roadway facilities by <br />either constructing a new bridge (either on the existing railroad alignment or along a new <br />alignment) or constructing tunnels under the existing railroad. In addition, there have been some <br />changes to cost estimates and the feasibility of the tunnel alternative which have complicated the <br />alternative selection process. <br /> <br />5. Dan Wilkins discussed some of the project challenges: <br />? <br /> The need to maintain both highway and railroad traffic makes project difficult. <br />? <br /> There are two options for dealing with train traffic if a new railroad bridge is constructed: Build <br />a bridge on a new railroad alignment or build a temporary railroad shoofly. <br />? <br /> The alternatives provide little opportunity for phasing, with the exception of the tunnel <br />alternative. <br />______________________________________________________________________________ <br />Town of Truckee <br />October 15, 2007 Mousehole Stakeholder Committee Meeting Minutes <br />Page 1 <br /> <br />